Construction Check-Off List

Designates material that can be supplied and/or installation that can be completed by International Greenhouse Company

 
Description Check Off Material Labor Estimated Cost
ENGINEERING: a a a a
   Survey Site a a a a
   Prepare Drawings for Building Permit a a a a
   Prepare Electrical Design Drawings a a a a
   Obtain Building Permit a a a a
SITE WORK:
   Establish and mark building location a a a a
   Site preparation including cut and fill a a a a
   Finish leveling of building pad a a a a
   Concrete for foundation a a a a
   Underground electrical a a a a
   Underground water a a a a
   Underground gas piping a a a a
   Underground storm sewer a a a a
   Greenhouse floor drains a a a a
   Greenhouse concrete slab or sidewalks a a a a
GREENHOUSE STRUCTURE 
   Steel Frame a a a a
   Door(s) a a a a
   Downspouts a a a a
   Glazing - roof, sides, ends a a a a
   Glazing extrusions a a a a
   Closure strips a a a a
   Glazing tape a a a a
   Screws and fasteners a a a a
   Caulking a a a a
HEATING SYSTEM:
   Unit Heaters a a a a
   Hanger rods for units a a a a
   Vent pipe a a a a
   Gas piping, valves, regulators a a a a
COOLING SYSTEM:
   HAF Fans or Fan Jet a a a a
   Fan Jet tubing a a a a
   Hanger rods for Fan Jet a a a a
   Fan Jet fresh air intake shutter a a a a
   Exhaust fan framing  a a a a
   Shutter framing a a a a
   Evaporative cooling system a a a
   Framing for cooling system a a a a
   Pump and piping for cooling system a a a a
   Sump tank for cooling system a a a a
   Inlet vent a a a a
   Vent Motor a a a a
   Inlet shutters a a a a
AUXILIARY SYSTEMS:
   Energy curtain a a a a
   CO2 System a a a a
   Fog System a a a a
   Humidifiers a a a a
   Crop support system a a a a
   HID Lights a a a a
   Fertilizer injector a a a a
   Benches a a a a
TEMPERATURE CONTROL:
   Controller a a a a
   Contractor panel a a a a
   Vent controllers a a a a
   Weather station a a a a
   Computer link a a a a
   Telephone alarm a a a a
WATER/IRRIGATION:
   Main shut off valve a a a a
   Backflow preventer a a a a
   Filtration system a a a a
   Hose bibs a a a a
   Irrigation system a a a a
   Irrigation controller a a a a
ELECTRICAL SYSTEM:
   New service connection a a a a
   Main panel with breakers a a a a
   Disconnect switches at equipment a a a a
   Duplex receptacles a a a a
   General lighting a a a a
   Equipment wiring a a a a
   Control wiring a a a a
   HPS wiring a a a a
HEADHOUSE:
   Structure a a a a
   Covering a a a a
   Potting benches a a a a
   Sink a a a a
   Hot water heater a a a a
   Storage cabinets and shelves a a a a
   Emergency eye wash a a a a
   Emergency shower a a a a
   Walk in cooler a a a a
   Rest Rooms a a a a
   Lunch Room a a a a
   Office a a a a
   Loading dock a a a a
   Sorting and grading equipment a a a a
   Soil and media storage bins a a a a
   Automated potting or seeding equipment a a a a

All content in this domain © 2003 by International Greenhouse Company
This page was last modified on 2/7/03